Harris Road Bridge and Neaves Road Bridge Full Closures Postponed

Updated May 14, 2024 - Please note both closures have been postponed. Closure information will be updated when new dates have been scheduled.


Please be advised there will be 24-hour full closures of Harris Road Bridge and Neaves Road Bridge as well as single-lane alternating closures between May 9-17, 2024 for scheduled repairs. There will be no emergency, pedestrian, or vehicular access during the following closures. Please plan ahead and follow the posted detour signage.

May 9, 2024 - Harris Road Bridge (postponed)

  • 24 HOUR FULL CLOSURE – NO EMERGENCY, PEDESTRIAN OR VEHICULAR ACCESS

  • Expected closure start time 7:00am

May 14, 2024 - Neaves Road Bridge (postponed)

  • 24 HOUR FULL CLOSURE – NO EMERGENCY, PEDESTRIAN OR VEHICULAR ACCESS

  • Expected closure start time 7:00am

May 9 to May 17, 2024 (postponed)

There will be re-occurring single lane alternating closures at both locations to install and remove signage and temporary plates.

Image