Golden Ears Bridge Lane Closures – September 24 to 27

Archived

Wednesday, September 24, 2025 - TransLink is advising travelers of overnight lane closures on the Golden Ears Bridge north approach between Airport Way and Fraser Industrial Way from Wednesday, September 24 to Saturday, September 27, between 9 p.m. and 6 a.m. daily.

During these hours, traffic will be reduced to one lane per direction (down from three). Signage will be in place to guide drivers, who are advised to slow down and use caution near work crews.

There are no anticipated impacts to transit services. For pedestrians and cyclists, the existing temporary sidewalk detour will remain in place, with only one side of the bridge open. Please follow posted directional signage.