As part of the 2022 Capital Works program the following paving and utility work will be made in multiple locations across the city throughout the summer:
- Paving work at:
- Old Dewdney Trunk Road between McKechnie Road and 210th Street
- Neaves Road, between Old Dewdney Trunk Road and the South Alouette River
- Ladner Road
- Hammond Road between Wildwood Crescent and Golden Ears Way
- Wildwood Crescent and South Wildwood Crescent
- Waterworks in the following areas:
- 188B St/120B Ave/189A St/120 Ave/188A
- 195A St/195B St
- 196A St/116B Ave
- 116A Ave
- Drainage improvements at the Pitt Meadows Family Recreation Centre parking lot
Specific dates will be posted when work is scheduled. Thank you for your patience during this time and please watch and obey traffic control personnel and signs in the area while this work is being completed.